Experiment Name: Satellite radiance and moisture analysis changes
| When | Who | What |
|---|---|---|
| 2001/02/13/12 | Gordon | Implemented. Emergency change to correct T62 PRMSL. |
| 2001/01/19/06 | Treadon | Correct bug (incorrect sign) introduced with 2001011212 change. |
| 2001/01/12/12 | Treadon | Change cloud liquid water correction of AMSU-A channels 1-5 & 15. Simulated temperature used in correction only includes time mean angle dependent component of bias correction. |
| 2001/01/11/18 | Iredell | New post computes 4 freezing level fields and smoothes PRMSL |
| 2000/12/22/12 | Treadon | Double observation errors (from 4.5K to 9.0K) for AMSU-A channels 1-3,15 and AMSU-B channel 1 |
| 2000/12/15/06 | Treadon | Turn on assimilation of SSM/I precipitation rates using 1x1 degree (lat,lon) superobs |
| 2000/12/13/06 | Treadon | Turn off NOAA-16 HIRS/3 radiances due to uncertainty in calibration coefficients. |
| 2000/12/04/06 | Iredell | Dump data now retrieved from asp. Parallel data no longer sent to ncosp. |
| 2000/11/28/12 | Iredell | Parallel paused again for 48 hours of Phase 2 systems maintenance. |
| 2000/11/27/12 | Derber | Assimilate NOAA-16 HIRS/3, AMSU-A, and AMSU-B radiances. |
| 2000/11/21/12 | Derber | Recompute angle dependent bias for radiances, including NOAA-16 data. Correct double counting of mean in bias correction code. |
| 2000/11/21/12 | Iredell | Parallel is caught up to real time. |
| 2000/11/13/12 | Su | NOAA-16 TOVS radiances now ingested but not used. |
| 2000/10/23/12 | Iredell | Parallel run paused while Phase 2 is upgraded. |
| 2000/10/02/12 | Treadon | Begin parallel run in catchup mode on Phase 2. |
Page Last Modified: February 13, 2001