Global Parallel Experiment Log

Experiment Name
CQCBUFR unfix
Parallel Slot
PRX
Control Slot
GFS
Start date of parallel experiment
2004/06/16/00 FNL
End date of parallel experiment
ongoing
Implementation date if any
was 2004/03/18/12
Environmental Modeling Center scientists
Mark Iredell, Dennis Keyser
Abstract (including Motivation, Hypothesis and Method)
The old CQCBUFR executable is used to test its impact for a short parallel run. The fix has already been implemented. The bug was that latitudes and longitudes were switched in the radiation correction.
Negligible forecast impact is expected.
Experiment changes log
Implementation changes list
Product changes list
Background links
Evaluation of parallel results
Daily forecast maps by Pete Caplan
Daily forecast stats by Pete Caplan
Verification against sondes and aircraft timeseries by Suru Saha
Verification against rawinsondes horizontal maps by Suru Saha
Verification against rawinsondes vertical maps by Suru Saha
Conclusion

Global Parallel Home Page

Disclaimer

Page Last Modified: June 23, 2004