Global Parallel Experiment Log

Experiment Name
T254 L64 Truncated
Parallel Slot
PRY
Control Slot
PRX
Start date of parallel experiment
2001/10/08/00
End date of parallel experiment
2001/12/03/00
Environmental Modeling Center scientists
Mark Iredell, Hua-Lu Pan, Shrinivas Moorthi, Bob Kistler, John Derber, Weiyu Yang, Russ Treadon, Dave Parrish, Peter Caplan, Suru Saha, Glenn White
Abstract (including Motivation, Hypothesis and Method)
The only difference between this experiment and the PRX is that the forecast is truncated to T126 L28 at hour 84. The motivation for this experiment is that it is quicker to run this way and that recent studies show that forecasts truncated after day 3 may have at least as much skill in days 4 through 7 as the full resolution forecasts.
Experiment changes log
Implementation changes list
Product changes list
Background links
Evaluation of parallel results
Daily forecast maps by Pete Caplan
Daily forecast stats by Pete Caplan
Verification of precipitation by Hua-Lu Pan
Verification against rawinsondes timeseries by Suru Saha
Verification against rawinsondes horizontal maps by Suru Saha
Verification against rawinsondes vertical maps by Suru Saha
Daily forecast maps for Hawaii by Bob Kistler
Conclusion
Truncating at hour 84 proved viable. The procedure was essentially moved to the PRX.

Global Parallel Home Page

Disclaimer

Page Last Modified: December 6, 2001